LoRaWAN Ki. Node Two Zhaga

LoRaWAN
Contact Sales
Quick Downloads
Product Data Sheet Download

The Ki. Node is a smart device that can be installed on new and existing street lighting infrastructure throughout a city. Each Ki. Node transforms the lamppost into a wireless communication point and connects to an interoperable ecosystem.

Ki. Node Two refers to the device with the inclusion of GPS. This node utilises LoRaWAN for the relay of information, messaging and alerts. Standard LoRaWAN uses 128-bit AES encryption. The node will encrypt the data payload using AES128 before loading it into a LoRaWAN frame. The frame is then encrypted again before being sent over the network using AES128. This ensures end to end encryption between the Ki. node and the Central Management System (CMS).

The Ki. Node is a smart device that can be installed on new and existing street lighting infrastructure throughout a city. Each Ki. Node transforms the lamppost into a wireless communication point and connects to an interoperable ecosystem.

Ki. Node Two refers to the device with the inclusion of GPS. This node utilises LoRaWAN for the relay of information, messaging and alerts. Standard LoRaWAN uses 128-bit AES encryption. The node will encrypt the data payload using AES128 before loading it into a LoRaWAN frame. The frame is then encrypted again before being sent over the network using AES128. This ensures end to end encryption between the Ki. node and the Central Management System (CMS).

Features

Specification

Dimensions

Compliance and Approvals

Have more questions about our products?

Product FAQs

Or would you like to place an order? Contact us

THM0037298 - Titan twin fuse cut out

THM0122926 - Trojan single phase EV isolator

THM0030635 - Trojan single fuse isolator

Case Studies

Case Study: London 2012 Olympics Velodrome

Lucy Zodion produce specialist equipped cabinet for London Velodrome Background As part of the preparations for the London Olympics 2012, a new Velodrome facility was constructed.…
Case Studies

Case Study: Driving down emissions for Portishead flagship EV Hub

Portishead’s flagship Rapid EV Charging Hub installs bespoke Lucy Zodion EV supply pillar to connect DNO with charge points. Project Summary Project name: Driving lower…
We’re dedicated to ensuring the products and solutions we provide are suitable for your project, which is why we have a number of support services to guide you at each step of your journey with Lucy Zodion. Get the help you need by clicking on one of the following services…

Customer Support

Technical Support

Contact us for more information on this product.