LoRaWAN Ki. Node Two NEMA

LoRaWAN
Contact Sales
Quick Downloads
Product Data Sheet Download

The Ki. Node is a smart device that can be installed on new and existing street lighting infrastructure throughout a city. Each Ki. Node transforms the lamppost into a wireless communication point and connects to an interoperable ecosystem.

Ki. Node Two refers to the device with the inclusion of GPS. This node utilises LoRaWAN for the relay of information, messaging and alerts. Standard LoRaWAN uses 128-bit AES encryption. The node will encrypt the data payload using AES128 before loading it into a LoRaWAN frame. The frame is then encrypted again before being sent over the network using AES128. This ensures end to end encryption between the Ki. node and the Central Management System (CMS).

The Ki. Node is a smart device that can be installed on new and existing street lighting infrastructure throughout a city. Each Ki. Node transforms the lamppost into a wireless communication point and connects to an interoperable ecosystem.

Ki. Node Two refers to the device with the inclusion of GPS. This node utilises LoRaWAN for the relay of information, messaging and alerts. Standard LoRaWAN uses 128-bit AES encryption. The node will encrypt the data payload using AES128 before loading it into a LoRaWAN frame. The frame is then encrypted again before being sent over the network using AES128. This ensures end to end encryption between the Ki. node and the Central Management System (CMS).

Features

Specification

Dimensions

Compliance and Approvals

Have more questions about our products?

Product FAQs

Or would you like to place an order? Contact us

Slim Line Pillars

T lock

PrecizionHALO 

Yale lock

Case Studies

Case Study: Oxfordshire Park & Charge

Summary Lucy Zodion recently worked alongside EZ-Charge and Oxfordshire County Council to provide 20 pre-wired EV feeder pillars: which will support the requirements of 250 new…
Case Studies

Lucy Electric and Lucy Zodion proud to collaborate on Camphill Village Trust, InstaVolt's latest rapid EV charging site

Client: InstaVolt  Location: Camphill Village Trust – Taurus Crafts  Completed: Mar-24  Products:  Lucy Electric: 500kVA package substation with a National Grid RMU, Lucy…
We’re dedicated to ensuring the products and solutions we provide are suitable for your project, which is why we have a number of support services to guide you at each step of your journey with Lucy Zodion. Get the help you need by clicking on one of the following services…

Customer Support

Technical Support

Contact us for more information on this product.